November update

Not a lot has happened in the last month. At least not a lot with the Jeep, but if other projects count I’ve been busy. I did get the Jeep logo welded in on the passenger side panel, and some more of the seam sealer on the wheel tubs.

Categories: CJ5

Starting body work

Now I’m mainly working on the floorpan. Filling the seams where the replacement panels meet up with the transmission tunnel, seam sealing everything, and a coat of primer. There was also a weird hole in the cowl that I think was from someone installing an antenna at some point. I cut a small patch to

Categories: CJ5

Quick update

This is just a small update for quite a bit of work. The tub is all welded together including the tailgate frame and wheel wells, and the body work phase has started. I’m still trying to pick a color, but I am thinking a lighter blue than the original “Navy Blue” color. The seats were

Categories: CJ5